Frog Mineral Pack
Low Chlorine Start-Up
Start-Up With Mineral Reservoir Out
Balance Pool
Shock pool with chlorine - double shock
Stabilize - do not backwash or rinse for 24-48 hours
Add algaecide
Total alkalinity
pH
Calcium hardness
Correct for iron and copper**
**When correcting for iron or copper, leave
mineral reservoir out for 24 hours after agent has been
added. Then proceed.
Install frog mineral reservoir and flow
control pac into the cycler. Run cycler with reservoir inserted
for 10 minutes on max setting. Turn back to 5. If to much
- back down one notch. If to low, turn up.
Remove flow control pac and disregard.
Inset low chlorine pac. Set control dial (follow guidelines
in owners manual). For one week test pool water for free